Bellarmine University

6 十月 2025
申请人数
3462
录取人数
3240
入读人数
632
中文名/译名
SAT EBRW 25%
535
SAT EBRW 75%
613
SAT Math 25th %
540
SAT Math 75th %
630
ACT Composite 25th %
22
ACT Composite 50th %
25
ACT Composite 75th %
28
介绍+详细信息
Page 31 of 37

faculty offices and classrooms. The facility also includes a courtyard for the science quadrangle. NHSC cost $6.5 million to build and was funded primarily by private donations.

=== Horrigan Hall ===

Horrigan Hall is named after the university's first president, Alfred Horrigan, and serves as the campus center. Architects Thomas J. Nolan & sons designed the facility in "modern" 1950s style and Al J. Schneider Company was the general contractor. The exterior is of rough textured brick with limestone trim. The three-story building sits atop a hill on campus featuring a six-story tower. Originally known as the Administration Building, Horrigan Hall was constructed in February 1953, costing $1 million. The facility was completely funded by private donations. Horrigan Hall has gone through a few remodeling and upgrades over the years. In December 1961 a new sound system was added, with central air following in 1970. In 1986–87 an elevator was installed and a new 2001 Newburg Road entrance was added as an alternative …

问答