Boise Bible College

6 十月 2025
申请人数
56
录取人数
54
入读人数
25
中文名/译名
SAT EBRW 25%
470
SAT EBRW 75%
620
SAT Math 25th %
450
SAT Math 75th %
580
介绍+详细信息
Page 6 of 7

this time all college offices were located in the lower level of one of the dormitories. The Library/Classroom Building was completed in 1995, which allowed the library to move from its cramped quarters in the MPB into a modern facility and provided needed classroom space for the growing student body and expanding programs of the college.
To accommodate growth, several construction projects began in the mid-2000s. The first phase of a new residence hall was opened for the Fall 2006 semester; the remaining phases (additional dormitory wing) are planned for the near future. A wing was also added to the Library/Classroom Building. This addition, including a new chapel, two auditorium-style lecture halls, and additional classroom space opened for the Spring 2007 semester.
In 2015, phase two of the construction project (i.e. the Student Center) opened and was completed.

== Student body ==
BBC currently enrolls about 125 students. Approximately one third of these students come from the Boise metro area, and another …

问答