Bridgewater State University

6 十月 2025
申请人数
8631
录取人数
7698
入读人数
1580
SAT EBRW 25%
530
SAT EBRW 75%
630
SAT Math 25th %
510
SAT Math 75th %
600
ACT Composite 25th %
18
ACT Composite 50th %
21
ACT Composite 75th %
27
介绍+详细信息
Page 19 of 24

level, with the stairs being replaced by ramps for improved accessibility, installation of larger, more energy-efficient windows and doors, and interior upgrades.
In April 2014, construction began on a new Welcome Center on Plymouth Street. The building is a two-story, 15,000-square-foot facility, and it houses the undergraduate and transfer admissions offices, along with the university's financial aid offices. Construction of the Welcome Center was completed in the Spring of 2015.
Renovations and additions to Woodward Hall began in June 2014 and finished shortly before the Fall 2014 semester commenced. The renovation included the installation of new floors, ceilings and walls, along with new bedroom furniture and the installation of an elevator & entrance stairs.

=== East Campus ===
Crimson Hall, a new 400-bed residence hall on the East Campus, opened in the fall of 2007.
The college has constructed a new 600-space parking area, the Tower Lot, behind the Operations Center. The lot where the new residence hall …

问答