Bridgewater State University

6 十月 2025
申请人数
8631
录取人数
7698
入读人数
1580
SAT EBRW 25%
530
SAT EBRW 75%
630
SAT Math 25th %
510
SAT Math 75th %
600
ACT Composite 25th %
18
ACT Composite 50th %
21
ACT Composite 75th %
27
介绍+详细信息
Page 20 of 24

is being built was a 1,000-spot parking lot. The new building has taken 400 of those 1,000. The Tower Lot has been built in an attempt to regain some parking spots lost during the construction.
There has been a discussion of building a fine and performing arts center in the distant future.
A new residence hall, Weygand Hall, was constructed on East Campus in 2013. The building uses geothermal and solar energy to minimize energy usage.
The roughly 200-space parking lot next to the MBTA railroad underpass on East Campus has been converted into a park to balance the construction of a parking garage behind Crimson Hall. Construction on the park was completed in late 2012.

=== Cape Cod campus ===
In November 2013, the university announced plans to open a satellite campus on Cape Cod. The opening of this satellite campus helped to accommodate the high number of students who commute daily to the main campus from Cape Cod. Approximately 600 Bridgewater State students reside on or commute from Cape Cod to the main campus …

问答