and Cypress for other students. To address a housing shortage, Cal Poly Humboldt contracted with four local hotels—the Motel 6, Super 8, Ramada Inn, and Comfort Inn—to provide approximately 350 beds of "bridge housing" to students. By 2023, however, the university eliminated three of the four options, leaving only the Comfort Inn as the only motel option. A new off-campus housing complex, Craftsman Mall, will house a thousand residents and is projected to open in fall 2025; new on-campus housing for an additional 600 to 700 students is projected to open in summer 2027. Cal Poly Humboldt announced it was closing the Campus Apartments in late January 2025 on the recommendations of a consultant after mold tests conducted in a recently vacated room. The apartments are expected to be demolished after the new Hinarr Hu Moulik housing complex opens. In April 2025, it was reported that Hinarr Hu Moulik would open for up to 600 students in the Fall 2025 semester.
=== Klamath Connection Program ===
The Klamath River …