a kitchen on each floor, and a server kitchen and main lounge with a fireplace on the main floor. The Office of Residence Life is located on the first floor of the new facility.
By 2015, a new $37-million Social Sciences Hall, 4,300-square-foot Bichum Engineering Laboratory, and 12,500-square-foot Campus Police Station opened. In 2011, the first floor of the Elihu Burritt Library was renovated to create a new common area with seating, couches, computers, and food vendors. Arute Field and its adjacent practice and baseball fields also underwent extensive construction and renovation from 2010 through the present, including new football, soccer, track, and practice field turf. New football, track, and soccer stadium seating were added, as well as construction on the Balf–Savin baseball field.
== Academics ==
There are over 400 full-time faculty, 83% of whom possess the terminal degree in their field. Another 501 part-time instructors also teach at the university.
=== Rankings ===
In 2025, U.S. News & World …