City College-Hollywood

6 十月 2025
申请人数
33
录取人数
33
入读人数
33
中文名/译名
介绍+详细信息
Page 39 of 55

named the Howard E. Wille Administration Building, in honor of Howard E. Wille, class of 1955, a distinguished alumnus and philanthropist.
The Marshak Science Building was completed in 1971 on the site of the former Jasper Oval, an open space previously used as a football field. The building was named after Robert Marshak, renowned physicist and president of CCNY (1970–1979). The Marshak building houses all science labs and adjoins the Mahoney Gymnasium and its athletic facilities.

In the 1970s, construction of the massive North Academic Center (NAC) was initiated. It was completed in 1984, and replaced Lewisohn Stadium and Klapper Hall. The NAC was designed by John Carl Warnecke. A student lounge space has murals celebrating the history of the campus on the doors of the undergraduate Student Government.

=== South Campus ===

In 1953, CCNY bought the campus of the Manhattanville College of the Sacred Heart (which, on a 1913 map, was shown as The Convent of the Sacred Heart), which added a south section to …

问答