The College of Saint Scholastica

6 十月 2025
申请人数
1608
录取人数
1508
入读人数
349
ACT Composite 25th %
21
ACT Composite 50th %
24
ACT Composite 75th %
27
介绍+详细信息
Page 10 of 15

the project in 1908; it was taken over by Franklin Ellerbe. The following year saw the groundbreaking and start of construction for Tower Hall. Its first unit was completed in 1909. That September, 75 students from the Institute of the Sacred Heart were relocated to what was then called Villa St. Scholastica. Tower Hall was completed in 1928, and had two towers, a north to south axis of 375 feet, turrets at each end, recessed fenestration, and Tudor towers flanking the façade.
Sharing the campus are St. Scholastica Monastery, home of the Benedictine Sisters; and the Benedictine Health Center and Westwood Assisted Living Facility, which provide experiences for many of the college's health science and behavioral arts and sciences students.
In September 2012, the college's Centennial year, St. Scholastica opened a 40,000 square-foot addition to its existing 125,000 square-foot Science Center. The addition includes seven laboratories for chemistry and biochemistry, six faculty-undergraduate student research areas, …

问答