An open "bridge" at the third-floor level led to the third floor of LaDue Auditorium and Marston Hall, which serves as the main classroom building. This building was part of the National Register of Historic Places.
In the spring of 2007, then-President Vincent James Mannoia was made aware of structural problems within Hogue Hall that led to a remodeling project in the building. In the summer of 2007, remodeling work on the lower floor found significant cracks in the timber holding up the masonry wall. When it became aware of the situation, the college stopped the remodeling and consulted with a structural engineer and architectural experts on old buildings for advice. These experts' initial inspection uncovered major structural concerns in the east wing of the historic building. Classes were moved from the four classrooms on the third floor of the building, and faculty with offices located in the east wing were relocated to the classrooms. After extensive consultation with local citizens, faculty, staff, alumni, …
SAT EBRW 25%
430
SAT EBRW 75%
608
SAT Math 25th %
381
SAT Math 75th %
611
ACT Composite 25th %
14
ACT Composite 50th %
21
ACT Composite 75th %
24
介绍+详细信息
Page 9 of 13