Lesley University

6 十月 2025
申请人数
2509
录取人数
2369
入读人数
189
中文名/译名
介绍+详细信息
Page 9 of 16

The project was built on the former site of the North Prospect Church, which was moved slightly to the south and repurposed. Also in 2013, Lesley University's constituent colleges, the Art Institute of Boston and Lesley College, were renamed College of Art and Design and College of Liberal Arts and Sciences, respectively; the change is reflective of the cohesion and growth of the two colleges.
In 2015, the College of Art and Design officially left Kenmore Square in Boston and joined the remainder of the university in Cambridge. This move marked the completion of the Lunder Arts Center as well as the first time in 17 years that the university was entirely housed in Cambridge. The Lunder Arts Center was awarded a LEED Gold certification from the U.S. Green Building Council. Lesley also won a prestigious Preservation Award from the Cambridge Historical Commission for the restoration of the historic former North Prospect Church as part o the Lunder Arts Center project.
At the end of the 2014–15 academic year, President …

问答