University of Massachusetts-Boston

6 十月 2025
申请人数
20918
录取人数
17353
入读人数
2463
SAT EBRW 25%
540
SAT EBRW 75%
650
SAT Math 25th %
540
SAT Math 75th %
640
ACT Composite 25th %
24
ACT Composite 50th %
27
ACT Composite 75th %
30
介绍+详细信息
Page 56 of 77

look like a coral reef. Nets hang from the ceiling to catch fragments of falling cement, a problem linked to the use of low-quality concrete in the construction.

Chunks of concrete had been falling from the garage ceiling since the 1990s, and when Chancellor Collins ordered the closure, 600 spaces had already been lost due to ongoing repairs and rerouting of passenger and vehicular traffic. Because of the salt water atmosphere and the road salt from vehicles, the steel reinforcing bars embedded in the campus substructure concrete walls and ceiling became severely degraded, and because all of the campus mechanical systems had run conduits through the substructure, many of those systems could not be repaired and the damage was causing outages of the computer, electrical, heat, and air-conditioning equipment. An engineering report indicated that to repair the garage such that it would be safe for parking would cost $150 million. On October 2, 2006, the university began the process of creating a master plan to renew …

问答