University of Massachusetts-Boston

6 十月 2025
申请人数
20918
录取人数
17353
入读人数
2463
SAT EBRW 25%
540
SAT EBRW 75%
650
SAT Math 25th %
540
SAT Math 75th %
640
ACT Composite 25th %
24
ACT Composite 50th %
27
ACT Composite 75th %
30
介绍+详细信息
Page 62 of 77

Point campus building opened in 1974. The facility was demolished as part of a $137 million project to construct a campus quad and 300-space parking lot in its place that began in July 2020.
Wheatley Hall – Original Columbia Point campus building opened in 1974. Named for Revolutionary War-era and first-published African-American female poet Phillis Wheatley.
Clark Athletic Center – Broke ground in 1978 and completed in 1979. On October 3, 2000, hosted the first debate between Texas Governor George W. Bush and Vice President Al Gore during the 2000 U.S. presidential election.
Campus Center – Broke ground in 2001 and completed in 2004. The building was designed by the Boston-based architectural firm Kallmann McKinnell & Wood and built by the Suffolk Construction Company at a cost of $80 million.
Integrated Sciences Complex – Broke ground in 2011 and completed in 2015. The building cost $182 million to construct, was designed by the Boston-based architectural firm Goody Clancy, and was constructed by Walsh Brothers.
Monan …

问答