University of Wyoming

6 十月 2025
申请人数
5644
录取人数
5498
入读人数
1463
中文名/译名
介绍+详细信息
Page 21 of 40

construction management firm, carried out the project in two phases to allow maximum use of the facility while it was under construction. Phase One would consist of the demolition and recreation of the east portion of the building. Phase Two would include the reopening of the east portion and the closure and construction of the west portion, which is the historical section of the building. Throughout the renovation, the university hoped to keep and incorporate as much of the historical structure and facade as possible.
The improvements included elevators, added classrooms, a space for athletic training, new racquetball courts, a climbing wall for Bouldering, a dance studio, a jogging/walking track, and new locker rooms with access to the pool.

=== Coe Library ===

The original library at the University of Wyoming consisted of 300 books and was located in Old Main. In 1923, the library was moved to the new Aven Nelson Memorial Building. With the 1950s came a larger student population and a greater push for America …

问答