Wilkes University

6 十月 2025
申请人数
6414
录取人数
5866
入读人数
513
中文名/译名
SAT EBRW 25%
510
SAT EBRW 75%
640
SAT Math 25th %
513
SAT Math 75th %
630
ACT Composite 25th %
20
ACT Composite 50th %
22
ACT Composite 75th %
29
介绍+详细信息
Page 17 of 43

"Eddie's Mailroom" in honor of the thirty-three year dedicated Wilkes University staff member.
On August 31, 2017, the university dedicated the Clayton and Theresa Karambelas Media and Communication Center, built within the structure of the original Bartikowsky Jewelers building on 25 West South Street by the Sordoni Contractors to be the first constructed to hold all the university media instruction holdings into one consolidated building. The building also houses the Sordoni Art Gallery that moved from its original location on the first level of the Stark Learning Center.
In March 2020, Wilkes University temporarily suspended in-person instruction and evacuated the campus as a safety measure to address the global COVID-19 pandemic. Under the leadership of interim president Paul S. Adams, the university continued basic operations and was able to safely re-open following strict protocols. Commencement for the Class of 2020 was postponed and eventually held in-person along with the Class of 2021.

=== Presidents …

问答