Due to the renovations, the Mariners' Museum Library moved back to the Mariners' Museum and reopened in Fall 2017.
In August 2018, the library expansion opened adding 3 floors of new space. Additions included a 100-seat theater, expanded Media Center, a two-story reading room, and 44 group study rooms.
=== Ferguson Center for the Arts ===
In 1996 the university acquired the Ferguson High School building and property, which was adjacent to campus. This building was used for classrooms until it was extensively renovated to become the Ferguson Center for the Arts, which opened in fall of 2005. Many features of the original high school, which was located between what is now the concert hall and the music and theatre hall, can still be seen throughout the current building. It houses a 1,725-seat concert hall which is acoustically engineered so that anyone on stage can be heard from any seat without a microphone, A 453-seat music and theatre hall, and a 200-seat studio theatre. It also contains two art galleries, …