Eckerd College

6 十月 2025
2026 Ranking
135
申请人数
4664
录取人数
3670
入读人数
537
中文名/译名
SAT EBRW 25%
600
SAT EBRW 75%
678
SAT Math 25th %
550
SAT Math 75th %
658
ACT Composite 25th %
24
ACT Composite 50th %
26
ACT Composite 75th %
29
介绍+详细信息
Page 19 of 31

high-speed cable and wireless connectivity are available throughout the library.
In addition to aquarium rooms, a marine sediment core facility, an oceanography lab, and a computer lab, the Galbraith Marine Science Laboratory, which was renovated in 2014, features a continuous flow-through system that pumps seawater into the building, so students can study marine organisms without harming them.
The James Center For Molecular and Life Sciences, a 51,000-square-foot (4,700 m2), $25 million laboratory facility, opened in February 2013. On the western side of campus, the Doyle Sailing Center was completed in 2016 to become the new home for the Eckerd Sailing teams. In 2018, The Helmar and Enole Nielsen Center for Visual Arts opened at the cost of a U.S. $15 million. This 33,000-square-foot (3,066 m2) center nurtures art forms from ancient to contemporary to not-yet-invented. All three projects incorporate green initiatives and feature natural landscaping to accent the facilities.

== Peter H. Armacost Library ==
In …

问答