campus's outdoor sports facilities include a 107,000 square foot turf stadium field named Gopher Stadium, three grass practice fields, an outdoor track, twelve tennis courts that opened in 2019 as part of the Evelyn Dyke Schroedl '62 Tennis Center, as well as separate courts for racquetball and squash, and an equestrian center. The Decker Sports and Recreation Center contains a six-lane, 25-yard pool, dance studios, a basketball court, gymnasium, varsity locker rooms, a fully equipped weight room, and a cardio fitness center. The equestrian center lies on the northernmost edge of campus and contains two barns, 10 turnout paddocks, indoor and outdoor riding rings, and several riding fields, in addition to wooded trails shared with pedestrians.
=== Design, layout, and sustainability ===
The architectural design firm responsible for planning the campus, Moore and Hutchins, elected to group buildings together into informal zones based on function, departing from the Romanesque style of the previous Baltimore campus. …