Moravian University

6 十月 2025
申请人数
5115
录取人数
2762
入读人数
515
中文名/译名
SAT EBRW 25%
540
SAT EBRW 75%
630
SAT Math 25th %
520
SAT Math 75th %
600
ACT Composite 25th %
24
ACT Composite 50th %
25
ACT Composite 75th %
28
介绍+详细信息
Page 19 of 24

as head golf coach. The field is located at the center of campus, with views from the residential halls, Reeves Library, and the portico of the Haupert Union Building (HUB), which has been razed and will re-open in August 2025 as a $42 million state-of-the-art student center with student mental and physical wellness central to the building design.
In 2017, the Sally Breidegam Miksiewicz Center for Health Sciences was opened at 1107 Main Street. The 55,000-square-foot facility hosts classes for both undergraduate and graduate programs, including nursing, informatics, and the health sciences and features the region's only virtual cadaver lab. The building is named in honor of former Moravian College trustee Sally Breidegam Miksiewicz.
Also located on the Main Street Campus is the Betty Prince field hockey field.

=== Steel Field Complex ===
Most of the university's athletic fields are located at this complex, including the football stadium with a grandstand capacity of 2,400 and Sportexe turf field, eight-lane …

问答