Williams College

6 十月 2025
2026 Ranking
1
申请人数
11465
录取人数
1145
入读人数
541
中文名/译名
SAT EBRW 25%
730
SAT EBRW 75%
770
SAT Math 25th %
740
SAT Math 75th %
790
ACT Composite 25th %
33
ACT Composite 50th %
34
ACT Composite 75th %
35
介绍+详细信息
Page 29 of 63

Center, opened in February 2007.
Construction had already begun on the third project, called the Stetson-Sawyer project, when it was delayed due to the 2008 financial crisis. College trustees initially balked at the Stetson-Sawyer project's cost, and revisited the idea of renovating Sawyer in its current location, an idea which proved not to be cost effective. The entire project includes construction of two new academic buildings, the removal of Sawyer Library from its current location, and the construction of a new library at the rear of a renovated Stetson Hall (which served as the college library prior to Sawyer's construction). The academic buildings, temporarily named North Academic Building and South Academic Building, were completed in fall 2008. In the spring of 2009, South Academic Building was renamed Schapiro Hall in honor of former president Morton O. Schapiro. In spring 2010 the North Academic Building was renamed Hollander Hall. Construction of the new Sawyer Library was completed in 2014, after …

问答