was added to the campus in 1911.
Allan Cullimore led the institution from 1920 to 1949 transforming Newark Technical School into Newark College of Engineering (NCE), a name change that was adopted in 1930. Campbell Hall was erected in 1925. Due to the Depression and World War II, only the former Newark Orphan Asylum, now Eberhardt Hall, was purchased and modestly renovated in the succeeding decades. Cullimore left an unpublished history of the institution dated 1955.
In 1946, about 75% of the freshman class had served in the U. S. Armed Forces. Cullimore Hall was built in 1958 and two years later the old Weston Hall was razed and replaced with the current seven-story structure. Doctoral level programs were introduced in 1960. Six years later, in 1966, an 18-acre (7.3 ha), four-building expansion was completed.
With the addition of the New Jersey School of Architecture in 1973, the institution had evolved into a technological university, offering a widening range of graduate and undergraduate degrees and an increasing …
中文名/译名
SAT EBRW 25%
590
SAT EBRW 75%
710
SAT Math 25th %
620
SAT Math 75th %
760
ACT Composite 25th %
25
ACT Composite 50th %
29
ACT Composite 75th %
32
介绍+详细信息
Page 19 of 50