University at Albany

6 十月 2025
2026 Ranking
127
申请人数
30740
录取人数
21477
入读人数
2836
介绍+详细信息
Page 30 of 53

studying areas for students, and a trading room equipped with Bloomberg terminals.

=== ETEC ===

In fall 2021, UAlbany unveiled ETEC (Emerging Technology and Entrepreneurship Complex) located on the Eastern portion of the main Uptown campus. The state-of-the-art $180 million research facility is one of the university's largest buildings at 246,000 square feet.

=== The Athletic Complex ===

UAlbany unveiled a new football stadium, Bob Ford Field, on September 14, 2013, as part of a $19 million multi-sport complex. The Great Danes opened against the University of Rhode Island. The stadium, named for the coach who guided the football program to 265 victories from 1973 to 2013, is an 8,500-seat facility which includes a press level with four luxury suites, a print media area, and booths for radio, television, coaches, and replay, as well as 20 high-definition televisions distributed throughout the level. In the summer of 2015, following a multimillion-dollar donation by Tom and Mary Casey, the complex was officially …

问答