University of California-Irvine

6 十月 2025
2026 Ranking
32
申请人数
121101
录取人数
30962
入读人数
6796
中文名/译名
介绍+详细信息
Page 38 of 68

Auditorium and the Rockwell Engineering Center, completed in 1990.
In a later reversal of Pereira's vision, a 2008 earthquake retrofit of Steinhaus Hall saw the removal of Pereira's signature sunshades for a "flat skin of stone and glass", after the precast originals had deteriorated and presented a hazard for those walking below.
In 2009, the Humanities Gateway building, designed by Curtis W. Fentress, was opened. The curvilinear design marked a return to the sculptural treatment of concrete begun by Pereira. The design sought to encapsulate the multifaceted nature of a humanities education, with a split-persona inspired by Janus, the two-faced god of mythological literature. The side that faces the Humanities Quad and the interior of the campus was intended to maintain formality and harmony with existing campus architecture while the opposing courtyard side contrasts this with an organic, free-flowing design. In addition, it achieved 57 of the 69 benchmark points (minimum 52) required to reach USGBC's LEED …

问答