University of Illinois-Chicago

6 十月 2025
2026 Ranking
84
申请人数
25420
录取人数
19955
入读人数
4647
SAT EBRW 25%
560
SAT EBRW 75%
660
SAT Math 25th %
560
SAT Math 75th %
680
ACT Composite 25th %
25
ACT Composite 50th %
28
ACT Composite 75th %
32
介绍+详细信息
Page 23 of 33

features found on Lincoln and Douglas Halls. The new fascia are all glass and the buildings contain facilities for faculty and students. There are plans to expand the renovation project to every lecture hall cluster if the pilot program is successful.
Other campus renovations include the roof of the Behavioral Sciences Building and the terrace of the Education, Performing Arts, and Social Work building. A brand new building housing the College of Engineering was opened in 2019 to accommodate the increased enrollment in the college. It features the only high bay structural laboratory in the city of Chicago.
To accommodate the rising enrollment in the computer science department, a new building is being constructed called the Computer Design Research and Learning Center (CDRLC); it is slated to be completed in the fall of 2024, with a budget of $117.8 million.

=== Sustainability ===

The university's Office of Sustainability was founded in January 2008. Current sustainability initiatives include lighting upgrades, …

问答