featured Vice President Joe Biden and Rep. Paul Ryan.
The physical campus has changed substantially during the 21st century. In 2005, the college completed The College Centre, a $22-million project to expand and renovate Suttcliffe Hall, the Crounse Academic Center and Grace Doherty Library, which was the largest construction project on campus since the Norton Center was built in 1973. Additionally, a new student residence, Pearl Hall, was completed in 2008; a new campus center opened in October 2009; and the construction of a new science wing in Young Hall was completed in the fall of 2010. In August 2011, Centre announced the construction of Brockman Residential Commons, a 125-bed facility offering apartment and townhouse living for upperclassmen. The residence facility was completed at the beginning of the 2012–13 school year.
Classes at Centre are held in spite of several federal holidays—including Presidents, Labor, Columbus, and Veterans Days—and rarely cancelled, which are points of pride among students, …
中文名/译名
SAT EBRW 25%
610
SAT EBRW 75%
683
SAT Math 25th %
620
SAT Math 75th %
740
ACT Composite 25th %
26
ACT Composite 50th %
29
ACT Composite 75th %
32
介绍+详细信息
Page 12 of 30